Excavation & grading in Mount Pleasant & Charleston
The dirt work under everything else: grading, site prep, bases for patios and walkways, pads and driveways, set so the ground sits level and water runs where it should.

What’s in the film
- Josiah climbs into the cab of Firm Foundation's new Cat 305 CR mini excavator.
- The excavator clears brush and small trees in a stand of pines and moves a fallen log.
- It digs into a pile of sandy fill and lifts a full bucket.
- It carries dirt through the trees and dumps it.
- It ends on the Firm Foundation badge.
Everything built outside sits on dirt that someone graded, or didn't. A patio on a soft base shifts. A pad that wasn't compacted settles. A driveway without a crown washes out. A yard that falls toward the house puts water against the foundation. Our excavation work is getting that ground right before anything goes on top of it.
What’s included
- Yard grading & levelingLow spots filled and slopes corrected so the yard drains and mows level
- Site prepGround cleared, cut and filled to the grade the next trade needs
- Patio & walkway basesDug out and compacted so the stone or pavers on top stay where they're set
- Bed & planting prepGround cut, shaped and graded before the beds and sod go in
- Driveway prep & gravel drivesCut, crowned and based so the stone stays where it's put
- Shed & equipment padsLevel, compacted pads that shed water instead of sitting in it
- TrenchingTrenches for drain lines and conduit, backfilled and packed
- Fill dirt & topsoilBrought in, spread and graded
- Haul-offSpoils loaded out so the site is clean when we leave
Questions people ask
Including the local rules. Where a town has the final word, we say which one and how to reach it.
How much does excavation & grading cost?
There's no price list here, on purpose: no two pieces of ground are the same. Josiah walks it and gives you a straight number. What it comes down to:
- How much dirt moves. The volume cut from the high spots and filled into the low ones.
- What comes in. Fill, stone or topsoil trucked to the site.
- What goes out. Spoils that have to be loaded and hauled away.
- Access. How easily a machine and a truck can reach the work.
- The finish. A rough grade, or a finish grade ready for sod or stone.
How do you stop a gravel driveway from rutting and washing out?
Either water crossing the drive instead of running alongside it, or a base that was never built to hold up under traffic. Adding stone on top of a soft base washes out again by the next storm.
Regrading the drive with a crown so water sheds to the sides, cutting drainage along it where needed, and prepping a proper base before any new stone goes down.
Can you prep a level pad for a shed or parking?
Not a problem so much as a job: something needs to sit on ground that is level, compacted, and drains, so it doesn't settle or sit in water later.
Clearing and grading the footprint, building a compacted base, and setting the grade so water sheds off the pad rather than sitting under whatever goes on it.
Can you bring in fill dirt to raise a low part of the yard?
Usually ground that has settled over the years, or was never brought up to grade when the house went in. Filling it without thinking about where the water goes only moves the puddle.
Bringing in fill or topsoil, spreading it, and grading it so it ties into the rest of the yard and still sheds water away from the house.
What machine do you use, and how deep can it dig?
Our own Cat 305 CR mini excavator, run by Josiah. It digs down to about 12 feet. CR stands for compact radius: the back of the machine stays within its tracks as it turns, so it can work close to a house, a fence or a tree line without swinging into them.
Do you call 811 before digging?
Yes. South Carolina puts that on whoever does the digging: notice goes in 3 to 12 working days before work starts, and it is free (S.C. Code §58-36-60). 811 only marks public lines up to the meter, so tell us about anything private: irrigation, a gas line to a pool heater, power run out to a shed.
How much should the yard slope away from the house?
The residential building code's minimum is 6 inches of fall within the first 10 feet out from the foundation (IRC R401.3). Where the lot is too tight or too flat to get that, a swale or a drain has to carry the water away instead.
Do I need a permit to grade my lot?
In Mount Pleasant, clearing, excavating or filling a lot needs a zoning permit first (Zoning Code §156.1171), and unincorporated Charleston County requires a stormwater permit once land disturbance passes 5,000 square feet. Near the marsh, state stormwater rules can apply to jobs well under an acre.
Can I rent your dump trailer?
Sometimes, when it isn't out on a job. Call or text Josiah with your dates and what you're hauling.
Let's talk about your next project
Tell us what you're dealing with
Free on-site quotes across Mount Pleasant and the greater Charleston area.
ServingMount Pleasant · Isle of Palms · Sullivan's Island · Daniel Island · Charleston · West Ashley · James Island · Johns Island · Folly Beach